Before master bedroom
|
After |
|
|
|
|
|
|
|
|
|
|
|
|
Details-
|
|
|
|
|
|
|
|
Master bedroom footing layout. |
Tony excavating foundations. |
|
|
Twelve inches below natural grade minimum. |
Batter boards and string lines. |
|
|
For perfect measurement and perfect square.
|
Master bedroom 3’ above living room finished floor. |
|
|
Foundation stair steps up the hill. |
Concrete is poured at 4 ½ inch slump. |
|
|
Concrete is thoroughly vibrated.
|
Vertical dowels will attach stem wall to foundation. |
|
|
String line and plumb bob precisely locate the building corner. |
Finished floor is the top of the batter boards and the concrete will be poured to finished floor level. |
|
|
Master bedroom stemwall forming is complete and squared. |
|
|
|
Block out to provide space for anchor bolts. |
Concrete is poured all the way to the top as we go. |
|
|
Stem wall concrete is poured at a 41/2” slump.
|
Block out for bedroom door. |
|
|
The concrete truck chute loads the LULL. |
The LULL reach-over tractor pours the far side of the master bedroom. |
|
|
|
|
|
|
|
Block out for 6”x6” steel post base in foreground. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|